Menard completed a ground improvement project for a private villa using Controlled Modulus Columns (CMC)
Cambodia | LFRD School Building
tazkiyachaerani2024-09-30T10:36:16+07:00Menard completed a ground improvement project for a new 3-story Light-Frame Residential and Dormitory (LFRD) school building using Controlled Modulus Columns (CMC)
Cambodia | Luang Mae Hospital Bunker Project
tazkiyachaerani2024-09-30T10:03:47+07:00Menard successfully completed a ground improvement project at the Luang Mae Hospital bunker in Phnom Penh City, Cambodia, using Controlled Modulus Columns (CMC).
Cambodia | Cargo Terminal Building for Techo International Airport – CMC
tazkiyachaerani2024-09-30T09:42:48+07:00Menard Cambodia – MGS Soil Treatment successfully completed a soil improvement project at Techo International Airport’s new cargo terminal building in Kandal, Cambodia using Controlled Modulus Columns (CMC) Rigid Inclusions.
Cambodia | Data Center Building – CMC
tazkiyachaerani2024-09-30T09:33:16+07:00Menard Cambodia successfully implemented ground improvement works using Controlled Modulus Columns (CMC) for the construction of a data center building in Phnom Penh..
Indonesia | MMP Cracks Rectification – CMC
tazkiyachaerani2024-09-25T10:42:35+07:00Discover how Menard Indonesia used Controlled Modulus Columns (CMC) to rectify soil cracks and stabilize a nickel smelter facility in Balikpapan.
Malaysia | Cameron Highland
tazkiyachaerani2024-10-04T11:25:02+07:00Menard Asia has completed a ground improvement project in Ringlet, Cameron Highlands. The project addressed the soft ground condition, which was anticipated due to the area's history as a former sediment dump from the adjacent site.
Malaysia | Desa Park City
tazkiyachaerani2024-12-14T07:09:00+07:00Dynamic Compaction Installation on uncontrolled backfill by Menard enables a more economical foundation system for residential construction.
Malaysia | Residential Development Area
tazkiyachaerani2024-06-05T09:23:21+07:00The project is a platform construction of two storey housing within the residential development area. The platform is designed to be approximately at 1.3 m above the existing ground level (EGL).
Malaysia | Single Storey Factory in Selangor
tazkiyachaerani2024-05-08T15:47:16+07:00Prefabricated Vertical Drain (PVD) has been installed by Menard to accelerate the consolidation of the compressible soils for the construction of a single storey factory in Selangor.