Menard Cambodia utililsed Deep Soil Mixing (DSM) to prevent slope failure at the intake site.
Cambodia | Bakheng Water Production Facilities – PVD/Wick drains
tazkiyachaerani2024-06-25T06:30:13+07:00The site presented complex ground conditions, with various challenging layers including backfilled sand, soft saturated clay, and hard sand. Menard’s PVD technology was employed to expedite the consolidation process, overcoming challenging ground conditions and strict timeline.
Cambodia | National Road 5 – Russey Keo Flyover – CMC
tazkiyachaerani2024-05-08T15:47:28+07:00Menard Cambodia implemented CMC which replaced RC piles and ground slab by a sandy load transfer platform, allowing costs and time saving to our client.
Cambodia | Techo International Airport – Soil Improvement under apron, taxiway
tazkiyachaerani2024-06-25T05:52:14+07:00The new Phnom Penh International Airport is a top-tier airport which accommodates all aircraft sizes. For it’s soil, Menard employed PVD technology to accelerate consolidation, using heavy machinery to maintain productivity and eliminate the need for client predrilling.
Cambodia | CBL Biomass Boiler Plant
Menard Asia - Admin2024-07-31T08:59:16+07:00Menard Asia has completed the ground improvement project for CBL Biomass Boiler Plant using Controlled Modulus Column (CMC)
Cambodia | Sihanoukville International Airport
Menard Asia - Admin2024-03-01T11:06:13+07:00Menard Asia has carried out ground improvement for the apron in Soekarno Hatta Int Airport Terminal 3 which is owned by PT. Angkasa Pura II.