Discover how Menard Indonesia used Controlled Modulus Columns (CMC) to rectify soil cracks and stabilize a nickel smelter facility in Balikpapan.
Indonesia | VVIP Airport, Capital City of Nusantara (IKN)
tazkiyachaerani2024-12-14T07:06:34+07:00Menard Asia has completed the ground improvement for the VVIP Airport Project with PVD and CMC in Indonesia
Indonesia | Kiantar Airport, Poto Tano
tazkiyachaerani2024-12-30T15:51:16+07:00Menard reinforced the soft soils beneath the runway extension at Rendani Airport in Indonesia with Controlled Modulus Column (KGM) to improve stability and support for aircraft loads.
Indonesia | Serang Panimbang Toll Road Phase III
tazkiyachaerani2024-08-05T10:34:59+07:00Menard Asia has completed the ground improvement for the Serang - Panimbang Toll Road Project with Controlled Modulus Column in Indonesia
Indonesia | Rendani Airport
Menard Asia - Admin2024-07-31T12:46:03+07:00Menard reinforced the soft soils beneath the runway extension at Rendani Airport in Indonesia with Controlled Modulus Column (KGM) to improve stability and support for aircraft loads.
Indonesia | Jakarta Airport Garuda Maintenance Facilities
coralielaval2024-06-26T02:12:04+07:00Menard Asia has completed the ground improvement for the Garuda Maintenance Facility at Soekarno Hatta International Airport with Controlled Modulus Column in Indonesia
Indonesia | New Yogyakarta International Airport
Menard Asia - Admin2024-07-31T09:12:20+07:00Menard Asia as a sub-contractor of PT. PP (Persero) Tbk has carried out ground improvement for the runway and taxiway in New Yogyakarta International Airport which is owned by PT. Angkasa Pura 1.
Indonesia | Krakatau Steel Harbour Stockyard
Menard Asia - Admin2024-08-30T20:21:56+07:00Menard Asia has completed a ground improvement project using the Controlled Modulus Column method for the Harbour Stockyard owned by Krakatau Steel in Banten, Indonesia.
Indonesia | RDMP Balikpapan
Menard Asia - Admin2024-06-16T04:16:25+07:00Industrial plant and equipment consist of special structures that are often very heavy and sensitive. Careful consideration must be taken during design and execution of ground improvement works to ensure the safe operation of the plant within the structure.
Indonesia | Soekarno Hatta International Airport Apron Terminal 3 – Phase 1 & 2
Menard Asia - Admin2024-12-30T15:35:51+07:00Menard Asia has carried out ground improvement for the apron in Soekarno Hatta Int Airport Terminal 3 which is owned by PT. Angkasa Pura II.