The site presented complex ground conditions, with various challenging layers including backfilled sand, soft saturated clay, and hard sand. Menard’s PVD technology was employed to expedite the consolidation process, overcoming challenging ground conditions and strict timeline.
Cambodia | Techo International Airport – Soil Improvement under apron, taxiway
tazkiyachaerani2024-06-25T05:52:14+07:00The new Phnom Penh International Airport is a top-tier airport which accommodates all aircraft sizes. For it’s soil, Menard employed PVD technology to accelerate consolidation, using heavy machinery to maintain productivity and eliminate the need for client predrilling.
Malaysia | Sapangar Bay Container Port
coralielaval2024-07-31T08:46:51+07:00Menard Asia completed the ground improvement for Container Port at Sapangar Bay with Prefabricated Vertical Drain in Malaysia
Malaysia | Bandar Universiti Pagoh
Menard Asia - Admin2024-07-31T09:15:33+07:00Menard Asia’s solution in Johor, Malaysia was using the Prefabricated Vertical Drain technique to treat the area for B15 and B16 Road of Bandar Universiti Pagoh.
Indonesia | Lontar Power Station
Menard Asia - Admin2024-07-31T11:55:53+07:00Industrial plant and equipment consist of special structures that are often very heavy and sensitive. Careful consideration must be taken during design and execution of ground improvement works to ensure the safe operation of the plant within the structure.