Menard Asia completed the ground improvement using Prefabricated Vertical Drain (PVD) for the Driving Experience Center at Sepang Circuit, Selangor, Malaysia, ensuring stable construction on soft ground.
Cambodia | New Chroy Changvar Bridge – CMC
Menard Asia - Admin2024-05-08T15:47:21+07:00Facing challenging ground conditions, Menard implemented CMC which not only replaced the initially planned RC ground slab but also integrated with a Reinforced Earth Wall.
Cambodia | National Road 5 – Russey Keo Flyover – CMC
tazkiyachaerani2024-05-08T15:47:28+07:00Menard Cambodia implemented CMC which replaced RC piles and ground slab by a sandy load transfer platform, allowing costs and time saving to our client.
Indonesia | Serang Panimbang Toll Road Phase III
tazkiyachaerani2024-08-05T10:34:59+07:00Menard Asia has completed the ground improvement for the Serang - Panimbang Toll Road Project with Controlled Modulus Column in Indonesia
Malaysia | Bandar Universiti Pagoh
Menard Asia - Admin2024-12-14T07:10:45+07:00Menard Asia’s solution in Johor, Malaysia was using the Prefabricated Vertical Drain technique to treat the area for B15 and B16 Road of Bandar Universiti Pagoh.
Road and Railway
admin75082021-06-02T16:42:22+07:00Road and railway are frequently built in areas where the soil is highly compressible. This type of project often involve the use of a variety of solutions to meet the wide-ranging geotechnical conditions and specific constraints of the terrain along the alignment.