Menard proposed a solution using Soil Mixing to ensure the stability of the platform during the temporary and final stage of the construction of the quay.
Vietnam | Gemalink Container Terminal
tazkiyachaerani2024-06-05T09:14:55+07:00Menard treated a 70 m band along the river bank in order to maintain the overall stability while the fill was raised on in the container area, treated by vertical drain and surcharge.
Vietnam | Ca Mau Power Plant Phase 1 & 2
tazkiyachaerani2024-06-05T09:16:09+07:00Menard Vacuum™ process ensured drastic reduction of the necessary amount of sand fill and especially the consolidation time (6 months instead of 14).
Vietnam | Ia Bang 1 Wind Power Project
tazkiyachaerani2024-07-31T12:50:07+07:00Menard’s solution allows to comply with the design criteria in terms of SLS bearing capacity, dynamic deformation modulus, and subgrade reaction coefficient, for the 12 turbines.
Vietnam | Phuong Mai 3 Wind Farm
Menard Asia - Admin2024-06-26T02:22:28+07:00Menard Asia’s solution in Binh Dinh Province was using the Controlled Modulus Column technique to treat the area for Phuong Mai 3 Wind Farm
Vietnam | Nghi Son Refinery
Menard Asia - Admin2024-07-31T12:54:05+07:00Industrial plant and equipment consist of special structures that are often very heavy and sensitive. Careful consideration must be taken during design and execution of ground improvement works to ensure the safe operation of the plant within the structure.
Vietnam | Cai Mep International Terminal
Menard Asia - Admin2024-07-31T08:42:32+07:00Menard Asia’s solution on Cai Mep International Terminal was using the Ménard Vacuum Consolidation to treat a 60 m wide band.
Vietnam | Dam Nai Wind Farm Project – Phase 2
admin75082024-06-20T15:57:32+07:00Menard Asia has completed soil improvement using Controlled Modulus Column for Dam Nai Wind Farm Project – Phase 2, in Ninh Thuan Province, Vietnam.