Menard completed a ground improvement project for a private villa using Controlled Modulus Columns (CMC)
Cambodia | Bakheng Water Production Facilities at Phase 3
tazkiyachaerani2024-09-30T11:10:12+07:00Menard completed a ground improvement project for a new 3-story Light-Frame Residential and Dormitory (LFRD) school building using Controlled Modulus Columns (CMC)
Cambodia | LFRD School Building
tazkiyachaerani2024-09-30T10:36:16+07:00Menard completed a ground improvement project for a new 3-story Light-Frame Residential and Dormitory (LFRD) school building using Controlled Modulus Columns (CMC)
Cambodia | Luang Mae Hospital Bunker Project
tazkiyachaerani2024-09-30T10:03:47+07:00Menard successfully completed a ground improvement project at the Luang Mae Hospital bunker in Phnom Penh City, Cambodia, using Controlled Modulus Columns (CMC).
Cambodia | Cargo Terminal Building for Techo International Airport – CMC
tazkiyachaerani2024-09-30T09:42:48+07:00Menard Cambodia – MGS Soil Treatment successfully completed a soil improvement project at Techo International Airport’s new cargo terminal building in Kandal, Cambodia using Controlled Modulus Columns (CMC) Rigid Inclusions.
Cambodia | Data Center Building – CMC
tazkiyachaerani2024-09-30T09:33:16+07:00Menard Cambodia successfully implemented ground improvement works using Controlled Modulus Columns (CMC) for the construction of a data center building in Phnom Penh..
Bangladesh | Soil Stabilization at Central Control Room for Nuclear Power Plants – DSM
tazkiyachaerani2024-12-05T20:49:54+07:00Menard completed a critical ground improvement project using Deep Soil Mixing at a nuclear power plant in Bangladesh. This technique stabilized silty sand conditions, ensuring the foundation’s strength and resilience against seismic activity.
Bangladesh | Physical Protection System of Main & Auxiliary Facilities for Nuclear Power Plants – DSM
tazkiyachaerani2024-12-05T20:43:14+07:00Discover how Menard used Deep Soil Mixing to improve soil stability and prevent liquefaction in silty sand conditions at a nuclear power plant in Bangladesh.
Indonesia | MMP Cracks Rectification – CMC
tazkiyachaerani2024-09-25T10:42:35+07:00Discover how Menard Indonesia used Controlled Modulus Columns (CMC) to rectify soil cracks and stabilize a nickel smelter facility in Balikpapan.
Indonesia | VVIP Airport, Capital City of Nusantara (IKN)
tazkiyachaerani2024-12-14T07:06:34+07:00Menard Asia has completed the ground improvement for the VVIP Airport Project with PVD and CMC in Indonesia