{"id":7979,"date":"2024-05-02T15:00:31","date_gmt":"2024-05-02T08:00:31","guid":{"rendered":"https:\/\/www.menard-asia.com\/?post_type=avada_portfolio&p=7979"},"modified":"2024-06-05T09:22:58","modified_gmt":"2024-06-05T02:22:58","slug":"malaysia-desa-park-city","status":"publish","type":"avada_portfolio","link":"https:\/\/www.menard-asia.com\/soil-expert-portfolio\/malaysia-desa-park-city\/","title":{"rendered":"Malaysia | Desa Park City"},"content":{"rendered":"

Dynamic Compaction<\/a> Installation on uncontrolled backfill by Menard enables a more economical foundation system for residential construction.<\/strong><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
CONTACT US<\/span><\/a><\/div>
<\/div>
<\/div>
<\/div>
<\/span><\/div>
<\/div><\/div><\/div><\/div><\/div>

Project Overview<\/strong><\/h2>\n

A residential project which consists of houses and high-rise condominium were to be built on uncontrolled backfill.<\/p>\n

Ground Condition<\/h2>\n

Project soil profile: 10m of Uncontrolled Backfill with Boulders Groundwater Level of 4m below ground level
\nProject specifications:
\n– To achieve working load of 150kN\/m2 for building footprint.
\n– To achieve working load of 75kN\/m2 for landscape area.<\/p>\n

Menard Solution<\/h2>\n

Dynamic Compaction (DC) was used to compact the uncontrolled backfill to allow the construction of shallow foundation for houses. The 13,347m2 was completed in 42 working days, allowing a more economical foundation system for the residential construction.<\/p>\n<\/div>

<\/div><\/div><\/div>

Project Information<\/strong><\/p>\n

Malaysia | 2011<\/strong><\/p>\n

Technique: Dynamic Compaction<\/strong><\/p>\n

Application: Buildings<\/strong><\/p>\n

13,347 m2 of Dynamic Compaction<\/p>\n<\/div>

<\/div><\/div><\/div><\/div><\/div>

Contact one of our experts today!<\/h2>\n<\/div>

\n

\n

<\/p>

    <\/ul><\/div>\n
    \n
    \n\n\n\n\n\n\n\n<\/div>\n